In the span of 2 156 days starting on February 15, 2019, the report indicates push-zb.helmholtz-muenchen.de passed 5 uptime tests. Push-zb.helmholtz-muenchen.de returned a 200 status code on February 15, 2019, marking the 1 time it was operational out of total checks performed. 80.00% of the time during the inspections, or 4 times, push-zb.helmholtz-muenchen.de was unavailable, the most recent instance occurred on January 9, 2025. As of January 11, 2025, it is confirmed by all received responses that none contained an error status. Push-zb.helmholtz-muenchen.de had an January 9, 2025, response time of — seconds, compared to its 0.235 seconds average.